1GENERAL NOTES Schedule of Rates is prepared for the year Operative from 1st Oct. and is applicable for P.W. Circle. Pune. This annual Progress Report for the year includes the important programmes and .. These are located in Mumbai (41), Thane (9) and Pune (38) district. These functioning .. DIC, Kolhapur DSR yet to be submitted. Dsr Pwd. Mumbai. Jun 19, -. PWD MAHARASHTRA. DSR. 17 Pune PWD DSR |. Deep dsr pune 13 pdf – dsr.

Author: Zulunos Kazrara
Country: Malawi
Language: English (Spanish)
Genre: Health and Food
Published (Last): 24 July 2017
Pages: 64
PDF File Size: 15.73 Mb
ePub File Size: 5.84 Mb
ISBN: 351-3-49486-671-2
Downloads: 3589
Price: Free* [*Free Regsitration Required]
Uploader: Tojalrajas

Published on Nov View 1. Sugarcane 2012-133 area 10 Km. Resolution Planning Department No. Copy attached in Pg. The increase in rates as above should be applicable only one at a time e. Issue rates of Schedule A materials for above notified area shall be increased by respective percentage. For supply items and providing Earth work in embankment of road materials lead is not considered in the rate analysis. Actual lead charges are to be added for these supply items.

Head load lead which is not to be deducted from lead and for other items the market rates are considered in the Statement A Statement A-1 – Material Master. The floor to floor height of 4.

  JOHN GUASPARI I KNOW IT WHEN I SEE IT PDF

For floor to floor height more than 4. The increase in rates as above should be on ground floor basic rates only. No cumulative increase 2012-133 be done. B Mild Steel Rs. C Tor Steel H. D Structural Steel Rs.

F High Tensile Steel Rs.

Rabtab DSR

Refinery Mumbaib The above rates are upne per the Rates charged by the main producers at their respective points of supply, as on the date of implementation of D. R; which includes all taxes such as excise, CST, Terminal tax, vat,educational tax etc.

Rate or prevailing stock issue rate, whichever is more. The same should be added in the rate analysis while framing the estimate and the amount shall be deducted from contractors bills as prescribed in the said G.

Current Schedule Rates P.W.D. DSR/CSR Pune, Maharastra, India – जरुरी Site

Directorate of Insurance Maharashtra State vide letter No. Pipes, der blocks, steel, tar bitumen, roofing felt, floor asphalt, steel, mating, bamboos and Ballies of all size, ceiling board, rubber P. Pipes, Pre stressed concrete pipes, A.

Rate of heating and unloading is Rs. For National Highway works rates of state D.

Bd-F Deals with the rate of concrete for grid slab, this item should be used for grid slab only i. Rubble, Metal, Sand, Murum etc.

Agency will have to produce documentary evidence to the concerned Executive Engineer, as regards payments made by Agency to Revenue Department towards royalty charges. If such documentary evidence is not produced the 2102-13 of Royalty charges as contemplated in the item shall not be paid to Agency.

  FRONIUS TPS 5000 PDF

pwd_civil_works_rate_analysis

Copy of Notification attached. However in case the rates are revised by Revenue and Forest Department time to time, the difference may be considered while preparing Estimate. Department vide letter No. Instead the concerned Executive Engineer shall approve the mix design by taking into consideration necessary parameters.

In case the quantity is more than Cu. The cost per trip shown in statement C, also includes charges of running empty vehicle for return trip.

For calculation of transportation charges rates tabulated in material master for following items are considered in the formula.

In Specific conditions if cofferdam, caging etc. For following items of Bridge works the separate rate analysis shall be approved by the Territorial Superintending Engineer: Pwd Dsr Pune Documents.

DSR Pune pwd civil work rates Documents. Pwd dsr pune 13 pdf – dsr 20121-3 13 pdf Tgs mklh dsr dsr pendidikan kel. Description of Items Unit Documents. DSR – Mdulo conceptual.