GPQ H&M PDF

GPQ stands for Guideline for Production and Quality Control as explained in H&M’s Quality Manual. But this term also commonly known as Garment Process. গার্মেন্টস এর কিছু এবরিবিয়েশন H&M= HENNAS & MARITZ. G.A.P= GAY AND PROUND. G.C.R=GARMENTS CHECK & RECOMMENDATION. H&M issued the “production and quality control manual” (GPQ), which aims to reach a consensus with the supplier on the acceptable quality standards.

Author: Mazular Akijora
Country: Syria
Language: English (Spanish)
Genre: Finance
Published (Last): 25 December 2005
Pages: 240
PDF File Size: 1.47 Mb
ePub File Size: 11.75 Mb
ISBN: 340-4-33838-450-6
Downloads: 44122
Price: Free* [*Free Regsitration Required]
Uploader: Muhn

Enter the email address you signed up with and we’ll email you a reset link. Until the confirmation has been approved after the prenatal order has effect.

Detergent for coloured Width: The quality of the sample should be as close as possible to the fabric composition, structure and weight of the mass product. Not applicable for products with no g;q rubbing problem. We compare the data analysis report result with one month to another month in every department. Record the results of the inspection in the whole production process.

H&M QUALITY STANDARDS & REQUIREMENTS Quality department | Goktug Under –

For example; Ski wear, Winter overalls, Swimwear, Alice bands etc. Exceptions Swimwear in white colour Change in colour: We keep the data from all the departments.

We have two b&m guy for every department against the department head. After finding out the root case we make a CAP Corrective action plan discussing the related department. The whole process from the production planning stage until the goods have quality control, this is a very important point.

Most Related  CULTIVO DE HONGOS ALUCINOGENOS PDF

All requirements are given in minimum value, e. The country should hold of them. We do this for any kinds of new design of fabrics, after finding out any technical limitation we do risk assessment also we do g&m each style with related department people.

In our factory we train the mid management on related work department wise. Any cost gpqq from failure to meet these regulations will be borne by the supplier. Stop production immediately after defects appear. Below products are excluded in this document.

By taking feedback they become in management and for that they can handle their lower level workers smoothly. It causes no problem. Size must conform to the size table, pattern, structural drawings and details of hm provisions of the relevant style, size, version, workmanship requirements. Identify problems, identify causes, and prevent problems from happening again.

Legal proceedings arising out of the import country according to the law. The color should be consistent with the color version.

Quality Manuals, Quality Procedures and Quality Standards of Top Apparel Brands

GPQ should be found as soon as possible and as a guide to solve the problem. Help Center Find new research papers in: Flammability apparel accessories test – general For test of long pile fabric, fake Face side: If the marker thread is reached after 7 sec, the surface flash is OK. Log In Sign Up. Click here to sign up.

After sorting out the matter we sit for a meeting with the related department and try to find out the root cause. One or more functions are requested e. Remember me on this computer. Use blue wool Plastic decorations on No major change reference fabric from swimwear, e.

Most Related  COMPLICACIONES DEL PUERPERIO INMEDIATO MEDIATO Y TARDIO PDF

gpw

» INTRODUCTION OF FACTORY’S QUALITY MANAGEMENT SYSTEMMETRO KNITTING & DYEING MILLS LTD.

Self extinguish No flame retardants are allowed Reverse side: By exam we take the feedback from them. Individual specimens must not burn faster than 6 sec.

Individual specimens must not burn faster than 4 – Fabrics with plain surfaces with sec. Skip to main content. Synthetics are NOT excluded Long pile j&m, fake fur etc.: Jewelleries earrings, necklace, bracelet etc.

Quality control manual for quality control of H&M compan

So, we have increased our quality demand with help of these of expert team. So, in the absence of the department head the backup guys can control and conduct all the works properly. All qualities must fulfil without base burn. Day by ypq our customer and buyer demands are going up increasing.

However, the main purpose of the inspection is not only to check the percentage of defective products, but also to point out the possible problems, and to correct these problems as soon as possible in the future production. GPQ should be found as soon as possible and as a guide to solve the problem